GRID MODERNIZATION

This project involved the engineering design support for the integration of four 2.35 MVA battery banks rated for 7,314 kWh total rated energy to facilitate the storage of electricity for stabilization purposes during peak load events. The project includes provisions for future solar PV development and integration as well.  The result of this project was the elimination of rolling blackouts during peak consumption times for an island utility.